images

Choose a project to explore

  • Job Duration: 12 Weeks
  • Client: JC Decaux

The Mission

Construct and install a 12.5m x 3.3m billboard structure and LED video screen on a railway viaduct over Woodville Rd

Construct and install OHS compliant access to same structure

Removal of existing graffiti

Challenges

Access to the site required traffic management and to be done at night due to the business of the road. The sign was mounted to a live and working railway bridge and needed co ordination with local authorities for safe access

There was another bridge directly above the new sign so head room with the crane for installation was extremely tight and specialist lifting gear was needed