images
Choose a project to explore
- Job Duration: 12 Weeks
- Client: JC Decaux
The Mission
Construct and install a 12.5m x 3.3m billboard structure and LED video screen on a railway viaduct over Woodville Rd
Construct and install OHS compliant access to same structure
Removal of existing graffiti
Challenges
Access to the site required traffic management and to be done at night due to the business of the road. The sign was mounted to a live and working railway bridge and needed co ordination with local authorities for safe access
There was another bridge directly above the new sign so head room with the crane for installation was extremely tight and specialist lifting gear was needed